Boron local is still all over the place.
The power and an usually heavy lift from Edwards is sitting on the wye at Edwards.
The pickups from Boron and located on the Boron Industry Lead, Boron House Track and also in the siding at Hinkley. I recommend the train at Edwards pickup the cut in the siding at Hinkley and return to Barstow. The two cuts located at Boron are about 7800ft in length, and over 11k tons. Might be good to have another set of power bring those to Barstow, the 4 engines at Edwards struggled just to pull those cuts out of Boron industry.
Mike